Congratulations to our Dpstar team for the First UK (Keadby 2) Combined Gas Cycle Power Plant Project completion of design, engineering and commissioning of electrical heat tracing system, instrumentation, power and control panels, and insulation.

Project Description

The power plant needed to have anti freeze, temperature control and maintenance and not forgetting insulation for their main equipment, pipeline, water feed, valves, pumps and instrumentation.

Dpstar Group’s engineering department did the FEED Front End Engineering Design, proposals and submission and was awarded the project after a rigorous international technical and tendering qualification process.

Companies from few countries participated and the criteria for selection and award was on the basis of best turnkey design, engineering, commercial, installation, commissioning and project references.